Skip to main content
{"id":8,"date":"2026-06-25T22:52:00","date_gmt":"2026-06-25T22:52:00","guid":{"rendered":"https:\/\/www.thecreekapts.com\/blog\/?p=8"},"modified":"2026-07-10T06:21:52","modified_gmt":"2026-07-10T06:21:52","slug":"a-guide-to-brushy-creek-regional-trail","status":"publish","type":"post","link":"https:\/\/www.thecreekapts.com\/blog\/2026\/06\/25\/a-guide-to-brushy-creek-regional-trail\/","title":{"rendered":"A Guide to Brushy Creek Regional Trail"},"content":{"rendered":"

 <\/p>\n

The Brushy Creek regional trail is a testament to Williamson County’s dedication to providing accessible recreation to the area.<\/p>\n

The Creek apartments give direct access to Brushy Creek Regional Trail. Located in Round Rock near the Play for All Abilities Park, our residents enjoy jogging, biking, and walking along the trail all year long.<\/p>\n

This is our guide to the Brushy Creek Regional Trail, including both the western segment in Cedar Park, and the eastern segment in Round Rock.<\/p>\n

 <\/p>\n

History of Brushy Creek Trail<\/h2>\n

Brushy Creek is a 69-mile-long tributary of the San Gabriel River, running east through Central Texas.  <\/p>\n

The Brushy Creek Regional Trail was established starting in 2001 in efforts for a connected trail extending from Cedar Park to Milam County. The plan was awarded a grant from Texas Parks and Wildlife Department for this regional trail in 2000.<\/p>\n

What started off as a short 2.5-mile trail composed of crushed rock located west of the I-35 highway has turned into a series of trailheads that expands just over 12 miles today.<\/p>\n

The western segment of Brushy Creek Regional Trail started construction in 2001 in partnership of TPWD, Williamson County, City of Austin, Fern Bluff and Brushy Creek MUDS, and two private ranches. It extended from Brushy Creek Lake Park to S. Great Oaks Drive.<\/p>\n

In 2003, the route expanded a mile east to Round Rock’s Creek Bend Boulevard.<\/p>\n

From 2007-2008, the trail expanded westward 3 miles from Brushy Creek Lake Park toward Twin Lakes Park, creating a continuous 6.75-mile trail that integrates major parks including Brushy Creek Sports Park, Brushy Creek Lake Park, and Champion Park.<\/p>\n

East of I-35 is the second Brushy Creek Regional Trailhead called Brushy Creek Trail East. This expansion to the Brushy Creek trail system began in 2005 at A.W. Grimes Boulevard, following along the creek toward Red Bud Lane.<\/p>\n

Later in 2014, the city of Round Rock expanded eastward from A. W. Grimes to N. Georgetown Street near downtown Round Rock.<\/p>\n

The trail system continues to receive support from Williamson County and local cities to create a fully connected trail from Cedar Park into Round Rock. With the 2024 addition of Heritage Trail West at Chisholm Park, the North Fork Trail in Cedar Park, and upcoming Heritage Trail East which will connect N Georgetown Street to Mays Street, this is becoming a future reality.<\/p>\n

 <\/p>\n

What You Need to Know to Hike or Bike the Trail<\/h2>\n

The Western Segment (Twin Lakes Park to Brightwater Blvd)<\/h3>\n